The client plans to build and operate a run-of-the-river hydroelectric power plant by exploiting Isla River waters and its tributary estuaries. It will count with an installed power of 4.2 MW and an average annual generation of 20 GWh, which will be injected to the Central Interconnected System.
We performed various studies and acted as a general coordinator for the participating disciplines in the development of the Environmental Impact Declaration (EID). Moreover, we carried out the processing of the Specific Permits (PAS) required.